General Construction • Completed

Residential Tower (B + G + M + P + 30 Typ.)

This project involves the construction of a residential tower with a basement, ground floor, mezzanine, parking levels, and 30 additional floors. It was developed by Blue Lake Properties in collaboration with Mazaya Engineering Consultant.

Location: -Client: Blue Lake PropertiesYear: 2015ResidentialTowerHigh-riseMEP Works
Residential Tower (B + G + M + P + 30 Typ.)

Project Overview

The Residential Tower project, which includes a basement (B), ground floor (G), mezzanine (M), parking levels (P), and 30 additional floors, is a modern development aimed at providing high-quality residential units. Located in a prime area, this tower was designed to offer luxury living spaces with a variety of amenities to meet the demands of urban residents. The tower consists of a well-planned layout, with each floor featuring spacious apartments, along with a combination of parking and recreational facilities. The construction process involved advanced engineering techniques and high-end materials to ensure safety, durability, and sustainability. The development team, led by Blue Lake Properties with guidance from Mazaya Engineering Consultant, was committed to delivering a state-of-the-art building that would not only enhance the local skyline but also improve the community's living experience. The infrastructure work, including the foundation, utilities, and parking solutions, was designed to optimize space usage and provide convenience for residents. The project also incorporated energy-efficient systems to reduce environmental impact and ensure long-term sustainability. The design of the building emphasizes both aesthetic appeal and functional use of space, with a focus on modern design trends and luxury finishes. The development was completed on time, within budget, and to the satisfaction of all stakeholders, establishing it as a significant addition to the city's real estate landscape. Consultant: Mazaya Eng. Consultant

Scope of Work

  • Construction of a residential tower (B+G+M+P+30 typ.)
  • Includes parking levels, residential units, and modern amenities
Project Completion Time
30 Months
Budget Adherence
100%

Related Projects

View all
Design and build of 60 Villas and Related Infrastructure Works Bidaa Al Mutawwa - (Western Region)
General Construction
Completed

Design and build of 60 Villas and Related Infrastructure Works Bidaa Al Mutawwa - (Western Region)

Bidaa Al Mutawwa, Western Region, Abu Dhabi

This project involves the design and construction of 60 villas, along with the required infrastructure works, located in the Western Region of Abu Dhabi.

Duration
24 Months
20 Villas Design & Build - Yabana, Western Region
General Construction
Completed

20 Villas Design & Build - Yabana, Western Region

Yabana, Jarrah, Western Region, Abu Dhabi

This project involves the design and construction of 20 villas, along with related infrastructure works, located in Yabana - Jarrah, in the Western Region of Abu Dhabi.

Duration
16 Months
Garden Tower (G + 5 P + 25 Typ. + SER + H.P.)
General Construction
Completed

Garden Tower (G + 5 P + 25 Typ. + SER + H.P.)

-

The project is a high-rise tower that includes a ground floor, 5 parking levels, 25 typical floors, service rooms (SER), and a helipad (H.P.).

Duration
28 Months